ترم زمستانی ٢٠١۷ در ماه فوریه در تورنتوی کانادا آغاز می شود. برای ثبت نام و یا اطلاعات بیشتر لطفا با ما تماس حاصل فرمائید.
At a glance
BRAMPTON CITY HALL
Description
This project was designed by Mr. Bijan Homayouni, as a project leader when he was employed in his previous employer.
The scope of work in this building was to upgrade the Heating & Cooling Plant as follows:
1- Demolish and remove entire boiler room
2- Install two new hot water boiler, primary and secondary loops and associated pumps
3- Two new domestic hot water heaters
4- Replace existing chiller
5- Remove and install two new VFD cooling towers and associated VFD pumps
6- Upgrade Building Automation System